2017 Finish-A-Long Q3 Projects and Q2 Recap

Hello Everyone! I hope all my American followers had a great 4th of July. It was noisy around here. A few years ago, Georgia legalized buying fireworks in the state. You used to have to go to Alabama or South Carolina to but them. On the 4th around here, the fireworks started going off around 7:00 and continued non-stop and in surround sound until 11:00. We were only able to see a few, but definitely could hear them.

2017-fal-button-125Now onto my list for the third quarter of the 2017 Finish-A-Long. I’m going to link my list up Charm About You.  I’m keeping the list a bit smaller this quarter because I’m involved in three block of the months and want to continue to work on my swoon blocks.

 

  1. Caitlyn’s T-Shirt Quilt
  2. Jake’s Quilt. This quilt has been on my list for a year. I just need to quilt it now!
  3. A new dress made from an Art Gallery Fabrics knit.
  4. Quilt the Blocks on the Go for Quilts that Grow.
  5. September’s “a year in the garden” embroidery
  6. July Mini’s and More, mini Tulip Market by Cory Yoder
  7. Not pictured – October’s “a year in the garden” embroidery, the embroidery is already traced.
  8. Not pictured – August Minis and More
  9. Not pictured – September Minis and More

These should keep me busy along with the Quilting Life block of the month,

IMG_4089

the Modablockheads Block of the Week, here’s the lasted one:

IMG_4352

Block 17, Trail of Tears, by Lisa Bongean.

and Jacquelynne Steves “I Love Home Block of the Month”. Here’s a sneak peak:

IMG_4294

I also want to continue to work on my swoon block.img_2869

Now to recap my Quarter 2 List.

I had 11 items on my list and finished 9:

This was a good quarter! You can read about my finishes here.

Thanks for stopping by!

signiture

 

 

 

This entry was posted in 2017 Finish-A-Long, A Year in the Garden Embroidery, Bags and Tote Bags, Blocks on the Go, for Quilts that Grow, Coins Quilt, Crosshatch Quilt, embroidery, FMQ, I Love Home BOM, minis, Minis and More, Moda Blockhead BOW, Pillows, Quilting Life BOM, T-Shirt Quilts, Uncategorized and tagged . Bookmark the permalink.

10 Responses to 2017 Finish-A-Long Q3 Projects and Q2 Recap

  1. I need to make a list and post it in front of me and stay focused. Brain is struggling to stay focused.

    Like

  2. Lydia S says:

    Goodness-you’ve gotten so much do so far this year.

    Like

  3. Pingback: July Minis and More and a FAL | The Quilting Nook

  4. Pingback: My Next Finish-A-Long and A Day Out | The Quilting Nook

  5. Pingback: Blocks On the Go for Quilts That Grow Finish! | The Quilting Nook

  6. Pingback: Mini Pumpkins and A Finish-A-Long | The Quilting Nook

  7. Pingback: September Embroidery and a Finish-A-Long | The Quilting Nook

  8. Pingback: A Finish for the 2017 Q3 Finish-A-Long | The Quilting Nook

  9. Pingback: September Minis and More and Last Finish for Q3 for the 2017 FAL | The Quilting Nook

Leave a comment